Tayana 55 Sloop
- Bateau REF# · 244664
- Longeur hors tout · 16.76m
- Année · 1988
- Construction · Fibre de Verre
- Coque · Quillard
- Couchettes · 5
- Moteur · 1 x gasoil 120cv, Perkins 6354 M (1988)
- Visible à · Phuket / Thailand
Ce bateau est vendu Voici d’autres bateaux à vendre
Détails supplémentaires
Architecte | Peter Beeldsnijder |
---|---|
Chantier | Ta Yang Yacht Building Co ( Taiwan ) |
Visible à | Phuket / Thailand |
Capacité carburant | 470.0 L Total - 2 Cuve(s) |
Capacité d'eau | 900.0 L Total - 2 Cuve(s) |
Capacité réservoir eaux noires | 50.0 L Total - 1 Cuve(s) |
Mécanique
Moteur | 1 x gasoil 120cv |
---|---|
Marque et le modèle du moteur | Perkins 6354 M (1988) |
Heures moteur | Inconnu |
Refroidi par | Indirect |
Barre | barre à roue |
Transmission | arbre d'hélice |
Hélice(s) | 3 Blade Max Prop |
Consommation carburant (approx) | 12.0 L /hr A vitesse de croisière |
Vitesse de croisière | 6 noeuds |
Vitesse Max | 10 noeuds |
Dimensions
Longeur hors tout | 16.76m |
---|---|
Longeur flottaison | 14.00m |
Bau | 4.90m |
Tirant d'eau Min | 2.20m |
Tirant d'eau Max | 2.20m |
Deplacement | 22,453kg |
Hauteur sous barrots | 1.90m |
Stationnement | Marina |
Voiles
Grand voile à ris | - Mât enrouleur () |
---|---|
Génois/foc | - Enrouleur () |
Autres voiles | Furling Staysail () |
Spinnaker () |
Equipement de Spi |
---|
Systèmes électriques
115 batterie volts,
Construction
Construction | Fibre de Verre |
---|---|
Coque | Quillard |
Finition | Peinture finition |
Aménagements
Nombre total de couchages | 5 |
---|---|
Nombre de lits doubles | 2 |
Nombre de lits simples | 1 |
Cabines | 3 |
Lavabo | 2 |
Douche | 2 |
Climatisation | 3 Climatisation Unités |
Toilettes | 2 Toilettes (électrique) |
4 feux(s) gaz cuisinière
Aménagements
Cuisinière | |
---|---|
Grill | |
Four | |
Evier | |
Frigo | |
Congélateur | |
Rideaux | |
Climatisation | |
Système d'eau manuel | |
Système d'eau sous pression | |
Système d'eau chaude | |
Pompe eau douce de pont | |
Douche cockpit | |
Non-fumeurs | |
Four à micro-ondes |
4 feux(s) gaz cuisinière
Accastillage de pont
Capote | |
---|---|
Taud de soleil | |
Amarres | |
Parre battages | |
Bossoirs | |
Jupe | |
Echelle de bain | |
Couvertures d'instruments | |
Bimini |
2 winch(s) de drisse
6 winch(s) d'écoute
électrique guindeau
2 ancre(s)
(Bugel style / CQR)
90.00m de chaîne
annexe (2013)
(Semi rigide)
8CV hors-bord, Suxuki (2013)
Equipement de Navigation
Compas | |
---|---|
Vitesse | |
Log | |
Vent | |
Radar | |
VHF | |
GPS | |
Traceur | |
Pilote automatique | |
Horloge | |
Baromètre | |
Feux de navigation | |
TV | |
Ordinateur | |
AIS | |
Sondeur |
Iridium Plus
Equipement de Sécurité
Radeau de sauvetage | |
---|---|
Gilets de sauvetage | |
Bouées couronnes | |
Projecteur de pont | |
Harnais de sécurité | |
Corne | |
Balise satellite 406MHz | |
Barre de secours |
4 pompes de cale (1 manuel / 2 électrique)
1 x Engine Driven Bilge Pump
Commentaires du Broker
Purchased in 2003 in Singapore by her current owner, to be used initially as a liveaboard and then to sail in retirement, however after an extensive refit ( details below ) his plans have changed and do not include extended sailing trips.
Upgrades/Refit
1. Above deck
• Teak deck sanded and re caulker
• Hydraulic cylinder on Vang replaced
• Raymarine Chart Plotter upgraded to e97 model
• Raymarine Radar upgraded to HD Colour
• Simradd Autopilot replaced with updated Raymarine EV-400 system, with remote cotnroller.
• New engine instrument panel installed.
• Wiring for Forestay furler re-routed (off the deck)
• Forestay lower bracket upgraded
• All sails inspected and repaired as necessary
• New deck cushions
• All safety wires replace.
2. Below Deck
a. Electrical
• New Charger/Inverter installed.
• Bow Thruster installed (Holland Marine –water jets)
• All wiring replaced and rerouted as necessary and old
installations removed.
• Electrical panel rewired
• 110v outlets connected.
• Ceiling lights upgraded.
b. Aircon and Refrigeration
• Lounge aircon overhauled
• Fore and aft cabin aircons’ serviced
• New 12v/AC refrigerator installed above counter
• Freezer overhauled with new compressor and cold plates
• Below counter drinks fridge overhauled
c. Plumbing
• All water lines checked and replaced as necessary.
• Fuel and water filler hoses replaced.
• Auto sump drains installed in showers
• New bilge pump with emergency electrical backup
installed.
• New Engine and Genset water exhaust hoses installed.
• New Stainless exhaust pipes (x2) installed.
• New sink/shower and toilet drain hoses.
• New Hot water heater installed (fitted for Engine exhaust preheat but not connected)
d. Galley
• Sidewall veneer replaced.
• Counter top veneer replaced with Corian
• Drawers and door facing highlighted with Teak
e. Cabins
• Mattresses and covers replaced as necessary
• Curtains replaced.
f. Engine Room
• Engine and gear box serviced as required (new exhaust elbow installed).
• New seal on oil pan and gearbox installed
• All new engine mounts.
• All sound proofing replaced with new material.
• New Raw water manifold
• Genset serviced as required.
3. Hull
• Hull above water line was sanded back to the fiberglass, covered with an epoxy coating and repainted with Awlgrip.
• Antifouling of bottom
• All through hull fittings below the water line replaced.
• All sea cocks replaced
• New prop shaft, flex coupler, and rope cutter
• Dripless shaft seal installed
These boat details are subject to contract.
Note: Offers on the asking price may be considered.